Component List
Operation of the XFEL Accelerator
Configuration after winter 23/24 maintenance period
- Injector steerers added
- APPLE-X undulators re-installed
- BAMC after SASE1,2,3 inserted
- XFELO chicane, photo-diode, mirror chambers inserted
component_list_2024.01.06
(15.8 MB)
component_list_2024.01.06.xls
Configuration after 2025 maintenance period
- ASPECT: Space for in-coupling chicane, ESASE chicane, compensation chicane added
- SCU: 8 undulator cells added after SA2, downstream section reworked
- STERN insert in XS4
- Post-SA3 streaker insertion
component_list_2026.01.10
(16.7 MB)
component_list_2026.01.10.xls
2025 Variants (not updated)
VariantBLUXE:
- Includes T20 extraction
component_list_2026.01.04BLUXE
(18.0 MB)
component_list_2026.01.04BLUXE.xls
Variant A:
- ASPECT: Holey mirror instead of first chicane
component_list_2026.01.01A
(15.9 MB)
component_list_2026.01.01A.xls
Old configuration after summer 23 maintenance period
- ASPECT wiggler (7 BP dipoles) inserted in T2
- OTRB.2199.T2 moved by 4 m to become OTRB.2203.T2
- BPMA.2455.T3 removed, BPMA.2461.T3 inserted
- KJX/KJY compensation kickers added in injector, replacing two KAX kickers
component_list_2023.07.02
(15.8 MB)
component_list_2023.07.02.xls