Component List
Operation of the XFEL Accelerator
Actual configuration (after summer 24 maintenance period)
- KL.1838.TL and KL.1965.TL exchanged with KMX.1938.TL/KNY.1938.TL resp. KMX.1965.TL/KNY.1965.TL
- XFELO MIRR1 position changed by +0.05m, MIRR2 position changed by -0.56mn
component_list_2024.07.04
(15.8 MB)
component_list_2024.07.04.xls
Configuration after winter 24/25 maintenance period
- KL.2006.TL added
component_list_2025.01.01
(15.8 MB)
component_list_2025.01.01.xls
Configuration after 2025 long installation and maintenance period (Update 18.12.2024)
- ASPECT: Space for in-coupling chicane, ESASE chicane, compensation chicane added
- SCU: 8 undulator cells added after SA2, downstream section reworked
- STERN insert in XS4
- Post-SA3 streaker insertion
component_list_2026.01.17
(16.8 MB)
component_list_2026.01.17.xls
Variants (not updated)
VariantBLUXE:
- Includes T20 extraction
component_list_2026.01.04BLUXE
(18.0 MB)
component_list_2026.01.04BLUXE.xls
Variant A:
- ASPECT: Holey mirror instead of first chicane
component_list_2026.01.01A
(15.9 MB)
component_list_2026.01.01A.xls