Component List
Operation of the XFEL Accelerator
Actual configuration after winter 24/25 maintenance period
component_list_2025.01.01.xls
Configuration after 2025 long installation and maintenance period (Update 20.02.2025)
- ASPECT: Space for in-coupling chicane, ESASE chicane, compensation chicane added
- SCU: 8 undulator cells added after SA2, downstream section reworked
- STERN insert in XS4
- Post-SA3 streaker insertion
component_list_2026.01.19.xls
Variants (not updated)
VariantBLUXE:
- Includes T20 extraction
component_list_2026.01.04BLUXE.xls
Variant A:
- ASPECT: Holey mirror instead of first chicane
component_list_2026.01.01A.xls