EMC Meetings

Here are the presentations and minutes of the more or less regular WP-39
meetings. The talks given at one meeting are combined into a single PDF file
which has been properly bookmarked. In Acrobat click on the Bookmark tab on the
left-hand side.

September 17th, 2007

  • H. Kapitza, Investigation of Noise in PETRA Correction Coil Power Supplies

August 20th, 2007

  • H. Kapitza, Tunnelerdung

July 30th, 2007    (Minutes)

  • H.-J. Eckoldt, N. Ngada, Pulse Cable Test with Separated Modulator and Transformer
  • P. Dost, H. Kapitza, XFEL Tunnel Grounding

November 13th, 2006

  • H. Kapitza, XFEL Grounding (3)

October 9th, 2006    (Minutes)

  • A. Winter, B. Steffen, Phase Jumps in FLASH
  • H. Kapitza, Some Remarks on Shielding

September 11th, 2006    (Minutes)

  • H.-J. Eckoldt, Installation of Pulse Cable in the Tunnel
  • H. Kapitza, EMC Status FLASH Injector Area
  • Discussion PETRA III Power Cabling

August 14th, 2006    (Minutes)

  • H. Kapitza, EMV-Status Umbauten im FLASH-Injektorbereich

July 10th, 2006   (Minutes)

May 29th, 2006    (Minutes)

  • H. Kapitza, EMI Steering Group Report
  • H. Kapitza, Erdung im XFEL-Tunnel (2)
  • M. Görler, Umbau 2nd Injector Laser Hut

April 10th, 2006    (Minutes)

  • H. Kapitza, EMI Steering Group Report
  • H. Kapitza, Erdung im XFEL-Tunnel
  • H. Kapitza, Umbau TTF2 Injector Rack Area
  • F. Obier (by Email), Toroidst├Ârungen vom Dunkelstrom-Kicker

February 27th, 2006    (Minutes)

  • H. Kapitza, EMI Steering Group Report
  • K. Wittenburg, Erfahrungsbericht Kabeldokumentationssystem
  • H. Kapitza, Magnet Power Supply Noise Measurements
  • N. Heidbrook, Power Supplies with Pre-Filters

January 30th, 2006    (Minutes)

  • H. Kapitza, EMI Steering Group Report
  • P. Göttlicher, XFEL Database for Cables - EMI View

December 12th, 2005    (Minutes)

  • H. Kapitza, EMI Steering Group Report
  • H. Kapitza, Mike Thuot's DESY EMC Report (General)
  • H.-J. Eckoldt, Report by Mike Thuot (Pulse Cable Issues)

October 17th, 2005    (Minutes)

  • H. Kapitza, EMI Steering Group Report
  • H.-J. Eckoldt, Disturbances During Operation of Pulse Cable
  • N. Ngada, Toroid Measurements

September 5th, 2005    (Minutes)

  • H. Kapitza, EMI Steering Group Report
  • H. Kapitza, Further Magnetic Field Measurements
  • H.-J. Eckoldt, Status Pulse Cable

July 25th, 2005    (Minutes)

  • H. Kapitza, EMI Steering Group Report
  • H. Kapitza, Magnetic Fields Induced by PETRA
  • R. Hanneken, Current Compensation in PETRA
  • H.Schlarb, Effect of PETRA p-Ramps for TTF2 Operation

June 27th, 2005    (Minutes)

  • H. Kapitza, EMI Steering Group Report
  • O. Kröplin, Potentialausgleich in Gebäuden
  • M. Görler, Ground Current Measurements
  • H.-J. Eckoldt, Disturbances from Power Supplies

May 30th, 2005    (Minutes)

  • H. Kapitza, EMI Steering Group Report
  • K. Schönbeck, TTF Grounding Scheme Modifications
  • P. Göttlicher, Grounding for an Electronic Hut
  • A. Knabbe, Notes on EOS Container Grounding

May 9th, 2005    (Minutes)

April 12th, 2005    (Minutes)

  • Ergebnisprotokoll: 1. Treffen zur Reduktion von EMI bei TTF

 