Minutes of the EMI/EMC Working Group Meeting on 29/05/06 ======================================================== Present: H.-J.Eckoldt, M.Görler, P.Göttlicher, O.Grimm, J.-P.Jensen, H.Kapitza, ======= K.Klose, H.Schlarb, J.Thomas Presentations: ============= The meeting presentations have been combined into one PDF file which was put into the EMI Elogbook: 1. EMI Steering Group Report (Herbert Kapitza) 2. Erdung im XFEL-Tunnel (2) (Herbert Kapitza) 3. Umbau 2nd Injector Laser Hut (Max Görler) 4. AOB Comments: ======== 2. Tunnel and Building Grounding: - Grounding rings have been introduced in every level of the injector complex, not just in the fundament. This makes a good ground grid. (JPJ) - The entry holes have disappeared in the XTL floor plates. Since it is quite practical to access the cables without disturbing tunnel traffic, they should be reintroduced -> T.Hott. (JPJ) - The mockup tunnel will be used to test pulse cable installation. (HJE) - The current in the tunnel wall remesh will not be more than a few A. (HJE) - N.Ngada has to finish his diploma work before the end of July -> present that on the next meeting. 4. AOB: - It was suggested to limit the meeting to 1 hour = 1 topic and to rather have it more often. This was unanimously agreed. Next meeting: Mon 10/07/06 11:00 30b/459 H.Kapitza