Minutes of the EMI/EMC Working Group Meeting on 17/10/05 ======================================================== Present: H.-J.Eckoldt, M.Görler, P.Göttlicher, Y.Holler, H.Kapitza, T.Lensch, ======= C.Müller, N.Ngada, R.Saust, H.Schlarb, L.Schreiter, A.Schwarz, M.Werner in Hamburg and L.Jachmann, W.Köhler, T.Thon, R.Wenndorff by video conference in Zeuthen Presentations: ============= The meeting presentations have been combined into one PDF file which was put into the EMI Elogbook (on 18/10/05): 1. EMI Steering Group Report (Herbert Kapitza) 2. Disturbances During Operation of Pulse Cable (Hans-Jörg Eckoldt) 3. Toroid Measurements (Narcisse Ngada) Comments: ======== 3. In the current configuration the observed high frequency noise does not disturb the measurement. That will be different once faster ADCs would be used. So it's still worthwhile to fight that noise. The noise situation at the injector racks will be a major topic to be discussed with Mike Thuot in November. H.Kapitza